Skip to content
Licensed Surveying & Cadastre Office · No 3106-310 0326 713 07 13 info@sahraharita.com.tr
Request a Quote
Energy Projects (Solar & Wind)

Consultancy and surveying for solar and wind energy projects

Site selection, permits, zoning, expropriation and surveying for licensed and unlicensed solar and wind plants.

Bringing a solar (GES) or wind (RES) plant to life starts with finding the right land and continues with permits from many institutions. We run the whole process for you, from site selection and grid application to local zoning plans and power line expropriation.

Project development

Land search and plant layout area

Selecting suitable land by slope, aspect, shading, access and distance to the grid connection point.

Institutional opinions and permits

Following up the required opinions from environmental (EIA), water, agriculture, highways and other authorities.

Application file and grid application

Preparing documents and filing the connection application with the distribution company.

Local zoning plan

Preparing the local zoning plan for the plant site.

Surveying and site

Solar and wind site setting-out

Setting out panel blocks, turbine positions, roads and substation areas on site.

Cadastral maps and expropriation

Cadastral maps and expropriation files for the plant and its access roads.

Power transmission line maps

Profile maps, easement and expropriation work along the transmission line route.

Infrastructure and construction

Building or supervising site roads, fencing, foundations and infrastructure.

Process

From finding land to grid connection

  1. 1

    Land

    Finding suitable land, checking title and zoning

  2. 2

    Opinions

    Environmental, water, agriculture and other opinions

  3. 3

    Application

    Grid connection application

  4. 4

    Zoning

    Local zoning plan and approval

  5. 5

    Build

    Setting-out, infrastructure and construction

Frequently asked questions

Common questions

How much land does an unlicensed solar plant need?

It depends on the panel type and slope, but roughly 1.5–2 hectares are needed per 1 MW. Let us assess your land together.

Can a solar plant be built on agricultural land?

It depends on the land class and the agriculture directorate's opinion; prime farmland is usually not permitted. We check this at the very start.

Let's talk about your project

Send us your parcel details or describe the job; we will reply with time and price the same day.